[Design Statement]

  • [Entrance]

    An extended and upgraded main entrance is accessed through new sliding drum doors with feature lighting.

    View Image View 3D Tour
  • [Main Reception Area]

    The main entrance is characterised by a restrained and timeless material and colour palette including honed ‘fume emparador’ limestone, granite and natural elements. Intricate bronze backlit artwork will form an attractive feature adjacent to a seating area that will include bronze tables, accent lighting made from natural stone and custom made armchairs.

    The ceiling has flush lighting set into its surface with metal tiled zones providing a sense of gentle movement at the entrance into the building.

    A new speed gate entry system provides secure access to the renovated lift lobby.

    View Image View 3D Tour
  • [Lift Lobby]

    Ceilings within the lift lobbies are recessed with a halo of indirect lighting from around a coffer boundary. Inset panels of perforated metal ceiling tiles with integral lighting ensure that these spaces have a light airy feel to them. The fumed emperador honed limestone floor finish wraps up the walls to provide a luxurious finish.

    View Image View 3D Tour
  • [WCs]

    WCs are being remodelled incorporating high quality finishes and redecoration. Vanity units of Marcella Blue Limestone with inset paper towel disposal and basins, wall mounted electronic taps, soap and paper towel dispensers.

    Tiled flooring in custom cut Stratton Umber Natural Ceramic Tiles.

    View Image View 3D Tour
  • [Shower Facilities]

    New shower facilities at ground floor level. Complimentary towels, soaps and concierge facility provided. Tiled flooring in custom cut Stratton Umber Natural Ceramic Tiles, full width luxury showers with custom designed all glass enclosures, walls fully tiled with Solus Ceramics Jorund Natural Ceramic tiles.

    View Image View 3D Tour
  • [Drying and Locker Room]

    Inset lockers within a purpose built locker room, leading onto a drying room with custom designed and constructed railed clothing hanging system, increased temperature and air changes within the room to aid drying.

    Tiled flooring in custom cut Stratton Umber Natural Ceramic Tiles, walls fully tiled with Solus Ceramics Jorund Natural Ceramic tiles throughout both rooms

    View Drying Room View Locker Room View 3D Tour
  • [Office Floors]

    The new available floors will benefit from a complete upgrade to include:

    • New high efficiency heating and cooling 4 pipe fan coil units.
    • Tiled suspended ceiling.
    • LED lighting with intelligent controls.
    • Provision for new floor mounted small power and data outlets.
    • Raised floors with 150mm void.
    • Platinum Wired Score
    View Images
  • [Plant]

    New high efficiency air cooled packaged water chiller plant to serve entire building complete with standby capacity. New intelligent central Building Energy Management System (BEMS) to control new plant and all new fan coil units.

  • [Concierge Facilities]

    Trained and professionally presented reception staff providing a boutique hotel-styled concierge service to occupiers and guests.

Drying Room CGI Locker Room CGI